Skip to content

OPAX is on iPhone and iPad. Get the app

Menu

Controlling corruption opportunities in the provision of maintenance services

Corruption prevention publication · Independent Commission Against Corruption (NSW ICAC) · New South Wales · Published

Report length
48 pages

Summary

The report's own summary: Overview, page 7

Generated summary: written by an AI model from the report text and checked against the cited pages.

  • The NSW Independent Commission Against Corruption provides guidance for officials responsible for facilities maintenance systems and contracts.

    Report, page 7

  • It draws on interviews with senior staff from 24 organisations and case studies to examine outsourced maintenance arrangements.

    Report, page 7 · Report, page 8

  • The Commission concludes that effective maintenance controls require asset and cost knowledge, separation of key duties and connected information about performance.

    Report, page 38

  • The Commission advises agencies to select contracting arrangements that match their staff capabilities and information systems, then review them as circumstances change.

    Report, page 38

In the body's own words

  1. Conclusion

    Regardless of its commercial arrangements, an agency should aim to be an informed client.

    Report, page 38

  2. Recommendation

    Agencies should design maintenance arrangements in accordance with their experience and capability.

    Report, page 38

Findings and recommendations

Allegations are not findings. A commission's finding or opinion of corrupt conduct or misconduct is not a finding that a person is guilty of a criminal offence, and the commissions say so in their reports.

No findings or recommendations are reproduced in this record. This does not establish that the report contains none.

Read the report (PDF, 48 pages)

Published responses

Responses to this report have not been checked.

Notes on this record

  • Corruption prevention and research reports make no findings about individuals; any recommendations are not extracted unless set out as numbered recommendations that could be read confidently.

Coverage

This publisher

  • Reports on investigations made public before 2016 are not online: the ICAC keeps only a summary for each, and copies must be requested from the ICAC. Those records hold the ICAC's published summary; findings and recommendations are not extracted.
  • The ICAC copyright statement reserves all rights (fair dealing aside). OPAX keeps short verbatim finding and recommendation passages with links to the original report.
  • Findings are read from the summary chapter of each report PDF. Where a finding's particulars run past the cited page only the finding statement is kept, and reports whose layout could not be read confidently are marked not_extracted.
  • Agency action plans and progress reports are listed as documents; their contents (implementation status for each recommendation) are not parsed.
  • Report PDFs without a text layer (scanned images, for example Operation Scania) are not OCRed; their findings stay not_extracted.
  • Many pre-2016 summaries give only the month a report was made public; those records carry no date and a note with the month, because the schema holds day-level dates only.